Referenser

E6 Arnkvern-Moelv road construction project in Norway

In November 2017 Veidekke AS won the bidding for the Arnkvern-Moelv road construction project. The project is massive and consists of the construction of 24 km of four-lane motorway, including several bridges, two railway bridges and two short tunnels.

Läs mer »
 
Pilotprojekt Pori stad

Staden Pori har länge haft planer på att digitalisera sina infrastrukturprojekt. Målet har varit att genomföra maskinstyrning så snart som möjligt, modernisera dokumentationen av arbetet och göra hela genomförandet av infrastrukturprojekt effektivare.

Läs mer »
CASE: The City of Hyvinkää – First Stage of the Hangonsilta Project

The first stage of the project was to clean the contaminated soil and prepare the area for residential construction.

Läs mer »
Vt6 Taavetti-Lappeenranta project on Infrakit

Highway 6, Taavetti-Lappeenranta (VT 6 TaaLa), is the main connector in South Karelia. In the project, the 29 km highway was expanded to have four lanes. 12 km of which was completely new road.

Läs mer »
CASE: City of Lahti – Suoniitynkatu Residential Street

One of the most challenging things about this project is to speed up the construction process. Suoniitynkatu is a ribbon-like street so it is quite difficult to create alternate routes among already existing structure

Läs mer »
CASE: Destia – Riippa-Eskola Double-Track Railway

The 30 km “Riippa-Eskola double track railway” project was completed on time. Financially the project was a resounding success with a profit margin of over 10%.

Läs mer »
CASE: YIT – E18 Hamina-Vaalimaa Motorway

Infrakit was taken in use in E18 Hamina-Vaalimaa project for on-site managers, foremen and surveying staff (~30 licences in total) and for 22 3D machine controlled equipment. Infrakit App for tablet is also in use in the project.

Läs mer »

1 4 5 6 7